RGC Top Banner
 
red side bar

 
 
Home
 
Tools
 
Publications
 
Image Library
 
SOQ
 
Site Index
 
Search RGC website
 
Request for Services
 
RGC News
 
RGC Admin
 
FTP

 

EnviroMine

HydroMine

 
black side bar
RGC Project Experience
Fullerton Remediation Project
British Columbia, Canada



Photo Illustrating installation of hydraulic barrier system.
Client:
Concert Properties Ltd.

Project Description:

Historic leakage of diesel fuel from several storage tanks located on the former Home Oil Depot property in North Vancouver had resulted in hydrocarbon contamination of the local groundwater. In 1996, Greystone Properties Ltd. (now Concert Properties) purchased the adjacent Fullerton property with plans to develop a Harbourside Business Park. However, one important condition for approval of the development plans by the City was the clean-up of the hydrocarbon contamination on this site.

Robertson GeoConsultants Inc. was retained to design a hydraulic barrier system that would protect the Fullerton site from re-contamination by groundwater from the neighbouring former Home Oil Depot site during and post remediation. A field investigation was carried out including drilling, water level monitoring and pump testing to characterize the local aquifer system. This field data was used to calibrate a three-dimensional groundwater flow model for the site. The calibrated model was then used to design a hydraulic barrier system consisting of a 270m long Waterloo Barrier®, seven extraction wells and a shallow drain system.

The remedial plan for the Fullerton site was approved and implemented in 1998. Robertson GeoConsultants Inc. was responsible for all aspects of design, construction supervision, operation and maintenance and performance monitoring of the hydraulic barrier system. The hydraulic barrier system proved to be successful in protecting the Fullerton lands from recontamination. Today, Harbour Business Park is considered one of the prime commercial real estate properties on the North Shore.

Services Provided:
  • 3-Dimensional Groundwater Flow Modeling
  • Hydraulic Testing
  • Construction Supervision
  • Performance Monitoring

Papers: Photos:

Click for more photos Photo Illustrating installation of hydraulic barrier system. Photo Illustrating installation of hydraulic barrier system. Photo Illustrating installation of hydraulic barrier system.
red side bar black side bar  
Developed and Maintained by Robertson GeoConsultants Inc.
Suite 330, 580 Hornby Street, Vancouver BC, CANADA V6C 3B6
Tel: (604) 684-8072 Fax: (604) 684-8073 e-mail: rgc@infomine.com 
  Top Menu Bar by: Milonic Solutions Ltd.   ;   Other Links
copyright © 2000-2008 Robertson GeoConsultants Inc.